Concourse A Update #5: Utilities Ready For Install
- March 2, 2023
- / Author Name
- / Concourse A

The Concourse A site is being prepared for the installation of utilities and foundation work.
Pictured to the east are C crates. Arriving and departing passengers for each airline have a designated tunnel made of shipping containers for the transition from the existing hold room to the apron, or in reverse upon arrival.
The idea was the result of a collaboration between construction and design teams who were looking for a way to create a seamless transition while protecting passengers at the same time. The containers will be placed and put into use early next week.